The Southeast Alaska Power Agency is seeking proposals from qualified industrial electric installation contractors to procure, install, and commission new 480V double-ended, Station Service Switchgear, 15kV Main Generator Switchgear, ancillary equipment, and cables from the new equipment to the first point of termination for the Tyee Lake Station Service Distribution System. The completion date for construction is on or before October 31, 2025. The Tyee Lake Hydroelectric Project is located approximately 40 airmiles SE of Wrangell, Alaska at the head of Bradfield Canal and is only accessible for boat or aircraft. Proposals are due by June 7, 2024 at 4PM AKDT.